It is a rectangular structure measuring 177.4 by 164.6 meters on the outside, featuring four corner towers—each measuring 20 by 30 meters in plan and 18.5 meters in height—that serve as vertical circulation cores and are topped with pyramidal roofs. The facades are divided into two levels and designed as open porticoes, incorporating a recurring X-shaped motif. The building is constructed of exposed reinforced concrete and prefabricated concrete panels—a material that the architect has frequently highlighted for its quality as a noble construction medium.
Carlos Tartiere Football Stadium
Structure
DESCRIPTION
In the heart of Oviedo
This new municipal stadium, accessible from Calle Alejandro Casona, bears the name Carlos Tartiere—the same name given for many years to the old Buenavista stadium, where Real Oviedo experienced so many glorious afternoons.
On September 17, 2000, the new Carlos Tartiere stadium made its debut with a First Division match between Real Oviedo and Unión Deportiva Las Palmas, which ended in a 2–2 draw. The official inauguration took place three days later (Wednesday, September 20)—coinciding with the local San Mateo festivities—with a friendly match between Real Oviedo and Partizan Belgrade.
It was built by the Oviedo City Council at one end of the Parque del Oeste (formerly the Ería de Buenavista), nestled in a hollow with elevation changes of up to 30 meters, with the pitch oriented along a north-south axis. The construction of the new football stadium for Real Oviedo was prompted by UEFA stadium safety guidelines, which mandated that all First Division football grounds must consist entirely of the seated capacity. This requirement was set to take effect for the 1998–99 season, though a grace period was granted to several clubs, including Real Oviedo. Under these regulations, the capacity of the Buenavista stadium would have been reduced from 23,500 to just 14,400. To address this issue, the City Council—the owner of the stadium—considered various solutions, such as remodeling the stadium by reorienting the structure or expanding the north stand, drawing upon a design by former municipal architect Florencio Muñiz Uribe. Ultimately, the mayor, Gabino de Lorenzo, decided that the City Council should undertake the construction of a new stadium, to be located at one end of the Parque del Oeste; a design-and-build competition was held for this purpose. The winning proposal was submitted by Dragados, featuring a design by architects Carlos Buxadé Ribot, Joan Margarit Consarnau, and Emilio Llano. The stadium is a rectangular structure—measuring 177.4 by 164.6 meters on the exterior—with four corner towers for vertical circulation that do not extend above the roofline. These towers measure 20 by 30 meters and range from 12 to 18.5 meters in height. The facades, finished in very light tones using exposed reinforced concrete and prefabricated concrete panels—chosen to minimize maintenance costs—are divided into two levels. They feature open, portico-like sections incorporating a recurring metal cross-bracing motif, a design element that also appears beneath the roof along the sides of the stadium. All four stands are covered with blue-lacquered metal sheeting, and the structure is designed to allow for a full enclosure—including the pitch—should that be desired in the future. The new stadium, which has a capacity of 30,084, features two lower tiers encircling the entire playing field, each containing 12 rows of seats. On the north and south ends, there is only one upper tier, while the sides feature a second, additional upper tier. The playing field, oriented north-south, measures 105 by 68 meters—the same as the old Tartiere stadium—with a minimum distance of 6 to 7.5 meters between the touchline and the spectator barrier. Access to the interior is provided by 24 entrances for the lower tier, while the upper tiers are reached via towers—directly from the surrounding development on the south side, and via two external staircases on the north side. The VIP stand is located in the western tier and features 320 seats. The main façade of the football stadium faces west, while the eastern side can also be accessed directly via a set of stairs and a pedestrian path from Alejandro Casona. Even before construction began, the project faced a significant challenge due to the nature of the site: the ground had been degraded by former ceramic industrial operations, featuring artificial embankments and elevation changes averaging between 10 and 20 meters. This complexity necessitated a high-cost foundation system—utilizing traditional footings—which alone required an investment of 417 million pesetas, in addition to the 389 million pesetas spent on site preparation. Work on the new Carlos Tartiere stadium began in 1999 with the construction of the main structure, followed by the installation of the metal roof—one of the most complex phases of the project, given the substantial size and weight of the roof components, which were designed to minimize the need for on-site welding.
The new stadium includes an external parking area.
Services
Clinic / Anti-doping control room / Catering and kitchen area – cafeterias / Communications and drivers’ room / Management and secretarial office / Reception and public service desk / Kitchens and workspaces / Logistics and equipment storage / Gym equipped with a warm-up area and strength-training machines / Transformer substation and power generator /
Club Area: director’s and secretary’s office, meeting room, catering, museum/exhibition zone, and shop / Soundproof booths and workstations.